Category: Elementary

Cook-Wissahickon School

Cook-Wissahickon School

201 E. Salaignac Street, 19128 | Grades: K-8 Active Project(s): Emergency Generator Replacement Construction Budget: $ 325,000 Status: Pending Bid Process Past ProjectsMajor System Improvement that included the removal of the existing and furnishing/installing 2 new condensing boilers. Remove existing and provide new dual-temperature piping and terminal heating and cooling units throughout the buildings. New...
Comley, Watson School

Comley, Watson School

1001 Byberry Road, 19116 | Grades: K-12 Active Project(s): Modular Addition and Major Renovation Construction Budget: $9,003,906 BOE Approval Date: TBD Status: Planning Phase Window replacement throughout the building Construction Budget: 1,387,000 Board Approval Date: 11/18/21 Status: Construction Phase
Child’s, George W. School

Child’s, George W. School

1599 Wharton St. 19146 | Grades: K-8 Active Project(s): Renovations will be made to approximately ten (8) toilet rooms. The enhancements include layout modifications, floor/wall/ceiling finishes, and toilet partitions and accessories. In addition, plumbing fixtures, vertical stacks, and mechanical ventilation will be replaced. LED lighting and controls will also be installed. Budget: $1,099, 000 BOE...
Casarez, Gloria Elementary School

Casarez, Gloria Elementary School

800 Ontario St| Grades: K-5 Active Project(s): Interior Door Replacement Budget: $554,000 Board Approval Date: 12/9/21 Estimated Completion Date: 6/30/25 Status: Construction Phase
Catharine, Joseph W. School

Catharine, Joseph W. School

6600 Chester Ave., 19142 | Grades: K-5 Active Project(s): Classroom Modernizations Modernization of (16) Pre-K through 3rd Grade classrooms. Replacement of movable partitions with infill walls. Wall and ceiling repainting. Ceiling and door replacement. New casework, cubbies, and built-in shelving. Refurbished and new classroom teaching boards. Install new lighting, clocks, power, data receptacles, and conduit...
Cassidy, Lewis C. Academics Plus School

Cassidy, Lewis C. Academics Plus School

6523 Lansdowne Ave, 19151 | Grades: K-8 Active Project (s): Construction of a new 21st-century learning facility The new Lewis C. The Cassidy Academic Plus School will serve 570 students Pre-K-8. The new school will replace the existing demolished Cassidy School. The school will have a total of 20 standard classrooms (2 per grade) and...
Carnell, Laura H. School

Carnell, Laura H. School

1100 Devereaux Ave.,19111 | Grades: K-5 Active Project (s): GESA1.2 Energy Efficiency Project GESA 1.2  Energy Conservation Measures include Domestic water upgrades and building envelope repair. Mechanical and Electrical installation in all areas. Electrical and control installation. Abatement work as well as  VCT tiles installed throughout. New Electrical (PECO) and Gas Services (PGW) access lines;...
Bregy, F. Amedee School

Bregy, F. Amedee School

1700 Bigler Street, 19145 | Grades: K-8 Active Project (s): TPL Schoolyard improvement with a stormwater return project and greening initiative, play structure, seating areas, and stormwater management. Budget: $ 1,919,950 BOE Approval Date: TBD Status: Pending Bids
Blankenburg, Rudolph School

Blankenburg, Rudolph School

4600 W. Girard Avenue, 19131 | Grades: K-8 Active Project (s): Exterior Structural Renovations Budget: $4,645,466 BOE Approval Date: TBD Status: Pending Bid Process Past ProjectsModernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door...
Allen, Ethan School

Allen, Ethan School

3001 W. Berks Street, 19121 | Grades: Pre-K – 8 Active Project(s): Window and Interior Door Replacement: Construction Budget: $3,145,250.00 Anticipated BOE Approval Date: 08/17/23 Status: Design Development