6701 N. 13th Street, 19126 | Grades: K-5 Active Project(s): Major System Replacement GESA 3 Energy Efficiency Upgrades; Replacement of Mechanical Systems to include HVAC Replacement, Chillers, Boilers, and Ventilation Units Budget: $15,798,141 BOE Approval Date: 12/15/22 Status: Design Phase Anticipated Completion Date: 9/30/2024 New window installations with added security screens, extensive brick repairs, and...
3199 D Street & Allegheny Avenue, 19134 | Grades: K-4 Active Project(s): Demolition and replacement of building roof Budget: $ 904,598.00 BOE Approval Date: August 23, 2022 Status: Construction Phase Construction Phase 50% Major Renovation intended to remove the existing and replace the HVAC distribution piping and terminal units throughout the building. The overarching goals include:...
8025 Thouron Avenue, 19150 | Grades: PreK-8 Active Project(s): Roof Replacement Construction Budget: $ 848,878 Anticipated BOE Approval Date: 03/23/23 Status: Bid Documents Major HVAC Renovation; Convert three steam boilers to hot water boilers. Install a new chiller. Removal of existing hot water piping and installation of new dual temperature piping system. New dual-temperature unit...
1750 North 12th Street, 19122 | Grades: K-8 Active Project(s): Past ProjectsModernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door replacement; New casework, cubbies, and built-in shelving; Refurbished and new classroom teaching boards.;...
1501 West Diamond Street, 19121 | Grades: K-8 Active Project(s): Phase two of schoolyard improvement; basketball and tennis court to be rebuilt and new fencing and seating areas installed. Budget: $ 675,000 BOE Approval: Status: Past ProjectsFlood Remediation General Contract Budget: $874,000 Mechanical Contract Budget: $1,217,760 Plumbing Contract Budget: $427,500 Electrical Contract Budget: $1,588,880 BOE...
2498 West Diamond St., 19121 | Grades: K-8 Active Project(s): Broiler System Replacement and Window Replacement Construction Budget: $ 15,746,128 Board Approval Date: March 23, 2023 Status: In Design
3500 Academy Road,19154 | Grades: K-8 Active Project(s): Emergency Generator Replacement includes the replacement of the existing emergency generator and emergency electric panels and extending the new fire alarm system into both the Annex ‘A’ and Annex ‘B’ buildings. Budget: $234,145 Board Approval Date: 1/27/22 Status: Construction Phase
3449 N Mascher St, 19140 | Grades: K-5 Active Project(s): Past ProjectsModernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door replacement; New casework, cubbies, and built-in shelving; Refurbished and new classroom teaching boards.; Install...
1300 W Loudon St, 19141 | Grades: K-8 Active Project(s): Removal and installation of new power-play torch down the modified bitumen roofing system. Extensive brick repairs including but not limited to: Joint Raking, Pointing, Defective brick removal, Crack settlement, Pressure washing, and sealant replacement. Budget: $4,581,675 BOE Approval Date: March 24, 2022 Status: Construction Phase