Facilities Planning Community Conversations – Join in person or virtually, Learn More.

Office Menu:

Category: Active Projects

Cook-Wissahickon School

Cook-Wissahickon School

201 E. Salaignac Street, 19128 | Grades: K-8 Active Project(s): Emergency Generator Replacement Construction Budget: $ 325,000 Status: Pending Bid Process Past ProjectsMajor System Improvement that included the removal of the existing and furnishing/installing 2 new condensing boilers. Remove existing and provide new dual-temperature piping and terminal heating and cooling units throughout the buildings. New...
Conwell, Russell Middle School

Conwell, Russell Middle School

1849 E. Clearfield Street, 19134 | Grades: 5-8 Active Project(s): Structural Renovations and Envelope repair Project Planning & Design focuses on the schematic design phase of a project. In this phase, we assess academic program requirements, review the existing layout, create new building designs, review building codes and regulations, coordinate schematics with consultants,  communicate design...
Comley, Watson School

Comley, Watson School

1001 Byberry Road, 19116 | Grades: K-12 Active Project(s): Modular Addition and Major Renovation Construction Budget: $9,003,906 BOE Approval Date: TBD Status: Planning Phase Window replacement throughout the building Construction Budget: 1,387,000 Board Approval Date: 11/18/21 Status: Construction Phase
Cleveland, Grover Mastery Charter School

Cleveland, Grover Mastery Charter School

3701 N 19th St, 19140 | Grades: K-12 Active Project(s): Broiler Replacement Budget: $2,951,087 BOE Approval Date: TBD Status: Planning Phase
Clemente, Roberto Middle School

Clemente, Roberto Middle School

122 W Erie Ave. 19140 | Grades: 6-8 Active Project(s): GESA 3 Energy Efficiency Upgrades; Replacement of Mechanical Systems to include HVAC Replacement, Chillers, Boilers, and  Ventilation Units Budget: $ 22,183,753 MM BOE Approval Date: 12/15/22 Status: Design Phase
Child’s, George W. School

Child’s, George W. School

1599 Wharton St. 19146 | Grades: K-8 Active Project(s): Renovations will be made to approximately ten (8) toilet rooms. The enhancements include layout modifications, floor/wall/ceiling finishes, and toilet partitions and accessories. In addition, plumbing fixtures, vertical stacks, and mechanical ventilation will be replaced. LED lighting and controls will also be installed. Budget: $1,099, 000 BOE...
Central High School

Central High School

1700 West Olney Avenue, 19141 | Grades: 9-12 Active Project(s): Structural Renovation/Central Field Budget: $4.8MM Status: Pending Bid Process
Casarez, Gloria Elementary School

Casarez, Gloria Elementary School

800 Ontario St| Grades: K-5 Active Project(s): Interior Door Replacement Budget: $554,000 Board Approval Date: 12/9/21 Estimated Completion Date: 6/30/25 Status: Construction Phase
Catharine, Joseph W. School

Catharine, Joseph W. School

6600 Chester Ave., 19142 | Grades: K-5 Active Project(s): Classroom Modernizations Modernization of (16) Pre-K through 3rd Grade classrooms. Replacement of movable partitions with infill walls. Wall and ceiling repainting. Ceiling and door replacement. New casework, cubbies, and built-in shelving. Refurbished and new classroom teaching boards. Install new lighting, clocks, power, data receptacles, and conduit...
Cassidy, Lewis C. Academics Plus School

Cassidy, Lewis C. Academics Plus School

6523 Lansdowne Ave, 19151 | Grades: K-8 Active Project (s): Construction of a new 21st-century learning facility The new Lewis C. The Cassidy Academic Plus School will serve 570 students Pre-K-8. The new school will replace the existing demolished Cassidy School. The school will have a total of 20 standard classrooms (2 per grade) and...