3449 N Mascher St, 19140 | Grades: K-5 Active Project(s): Past ProjectsModernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door replacement; New casework, cubbies, and built-in shelving; Refurbished and new classroom teaching boards.; Install...
1300 W Loudon St, 19141 | Grades: K-8 Active Project(s): Removal and installation of new power-play torch down the modified bitumen roofing system. Extensive brick repairs including but not limited to: Joint Raking, Pointing, Defective brick removal, Crack settlement, Pressure washing, and sealant replacement. Budget: $4,581,675 BOE Approval Date: March 24, 2022 Status: Construction Phase
201 E. Salaignac Street, 19128 | Grades: K-8 Active Project(s): Emergency Generator Replacement Construction Budget: $ 325,000 Status: Pending Bid Process Past ProjectsMajor System Improvement that included the removal of the existing and furnishing/installing 2 new condensing boilers. Remove existing and provide new dual-temperature piping and terminal heating and cooling units throughout the buildings. New...
1849 E. Clearfield Street, 19134 | Grades: 5-8 Active Project(s): Structural Renovations and Envelope repair Project Planning & Design focuses on the schematic design phase of a project. In this phase, we assess academic program requirements, review the existing layout, create new building designs, review building codes and regulations, coordinate schematics with consultants, communicate design...
1001 Byberry Road, 19116 | Grades: K-12 Active Project(s): Modular Addition and Major Renovation Construction Budget: $9,003,906 BOE Approval Date: TBD Status: Planning Phase Window replacement throughout the building Construction Budget: 1,387,000 Board Approval Date: 11/18/21 Status: Construction Phase
122 W Erie Ave. 19140 | Grades: 6-8 Active Project(s): GESA 3 Energy Efficiency Upgrades; Replacement of Mechanical Systems to include HVAC Replacement, Chillers, Boilers, and Ventilation Units Budget: $ 22,183,753 MM BOE Approval Date: 12/15/22 Status: Design Phase
1599 Wharton St. 19146 | Grades: K-8 Active Project(s): Renovations will be made to approximately ten (8) toilet rooms. The enhancements include layout modifications, floor/wall/ceiling finishes, and toilet partitions and accessories. In addition, plumbing fixtures, vertical stacks, and mechanical ventilation will be replaced. LED lighting and controls will also be installed. Budget: $1,099, 000 BOE...