Posted on June 21, 2024
Categories: Active Projects, Elementary

1100 Devereaux Ave.,19111 | Grades: K-5

Active Project (s):

GESA1.2 Energy Efficiency Project

GESA 1.2  Energy Conservation Measures include Domestic water upgrades and building envelope repair. Mechanical and Electrical installation in all areas. Electrical and control installation. Abatement work as well as  VCT tiles installed throughout. New Electrical (PECO) and Gas Services (PGW) access lines; demolition and removal of old equipment; New Chiller installation; New hallway cabinet units and classroom ceiling units,’ Dual-temperature piping work in the original building; New Broiler installation; Demolition and replacement of an emergency generator system.

  • Construction Budget: $19.1 MM
  • BOE Approval Date:
  • Anticipated Completion Date: 10/2023

Past Projects

Modernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door replacement; New casework, cubbies, and built-in shelving; Refurbished and new classroom teaching boards.; Install new lighting, clocks, power, data receptacles, and conduit pathways;  Classroom sink and toilet replacement; Heating valve and trap replacement; Hydration Station replacement; New window AC units; VCT floor replacement and Hardwood floor refinishing; All new classroom furnishings and new interactive Panelboards; Slate chalkboards and cork bulletin boards will be replaced with magnetic white marker boards and tack boards.

  • Construction Budget: $ $1,615,870
  • BOE Approval Date: 04/22/21
  • Completion: Fall 2021

Modernization of specified classrooms and installation of new furnishings and technology. Modernization of classrooms to include replacement of movable partitions with infill walls; Wall and ceiling repainting; Ceiling and door replacement; New casework, cubbies, and built-in shelving; Refurbished and new classroom teaching boards.; Install new lighting, clocks, power, data receptacles, and conduit pathways;  Classroom sink and toilet replacement; Heating valve and trap replacement; Hydration Station replacement; New window AC units; VCT floor replacement and Hardwood floor refinishing; All new classroom furnishings and new interactive Panelboards; Slate chalkboards and cork bulletin boards will be replaced with magnetic white marker boards and tack boards.

  • Construction Budget: $610,000
  • BOE Approval Date: 4/22/21
  • Completion: Fall 2021